Optimize positioning of a drilling rig

Optimize positioning of a drilling rig

Image Caption: Picture from onshore testing of Log grapple and 2m Tilt bucket Planning Phase Project specific challenges were highlighted in the planning phase. Based on the significant volume of mass to be processed, we had learned from the 2018 campaign that the...
Rock installation to optimize positioning of a drilling rig

Rock installation to optimize positioning of a drilling rig

Image Caption: Picture from onshore testing of new grab Planning Phase In the planning phase we went through the scope of work to highlight project specific challenges. Based on the large volume, the conclusion was that a traditional ejector setup was not ideal as...
Rock installation inside substation jacket

Rock installation inside substation jacket

Image Caption: 15Te Scanmachine (top) and Scancrawler Planning Phase Once the substation jacket was installed, a rock dumping vessel performed the scour protection around the jacket, but there was still a need for rock installation inside the jacket. To solve this...